Home/Answers/Budget
WATER DAMAGE COST LAB / Budget

After Budget Processing

After Budget, spot-check the output, then decide whether to delete/archive the original; keep a backup.

Updated 2026-11-03About 3 minLocal test
Quick answer

After Budget, spot-check the output, then decide whether to delete/archive the original; keep a backup. Budget = drying + demolition + mold + rebuild + contents + housing; keep buffer.

Why it matters

A backup lets you roll back if the output is wrong.

Drying.

Step by step

  1. Stop water/power/photograph/contact insurance.
  2. Separate drying/demolition/mold/rebuild/contents.
  3. Get 2-3 quotes; confirm scope/equipment/timing.
  4. Claim states deductible/exclusions/depreciation.

Common mistakes

  • No photos/claim.
  • Comparing totals without scope/equipment.
  • Ignoring mold/hidden moisture.
  • Not checking deductible/depreciation/exclusions.

Checklist

  • Stop water/power/photos/insurance.
  • Drying/demolition/mold/rebuild/contents.
  • Scope/equipment/timing/quotes.
  • Deductible/depreciation/exclusions/claim.
  • Contract/payment/warranty.

Who it is for

If this is your first Budget, narrow by Drying. and Rebuild. first, then look at specific models.

Key facts

  • Drying.
  • Rebuild.
  • Buffer.

FAQ

What should I do after Budget?

After Budget, spot-check the output, then decide whether to delete/archive the original; keep a backup. Budget = drying + demolition + mold + rebuild + contents + housing; keep buffer.

How long does it take?

Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.

Is data uploaded?

Runs locally and does not upload video/audio; extensions may still read the page.

Source: IICRC