Quick answer
For Contractor, follow a checklist: backup, format, size/quality, output, spot-check. Credentials/insurance/certification/portfolio/quotes.
Why it matters
A fixed checklist prevents skipping the critical step.
Credentials.
Step by step
- Stop water/power/photograph/contact insurance.
- Separate drying/demolition/mold/rebuild/contents.
- Get 2-3 quotes; confirm scope/equipment/timing.
- Claim states deductible/exclusions/depreciation.
Common mistakes
- No photos/claim.
- Comparing totals without scope/equipment.
- Ignoring mold/hidden moisture.
- Not checking deductible/depreciation/exclusions.
Checklist
- Stop water/power/photos/insurance.
- Drying/demolition/mold/rebuild/contents.
- Scope/equipment/timing/quotes.
- Deductible/depreciation/exclusions/claim.
- Contract/payment/warranty.
Who it is for
If this is your first Contractor, narrow by Credentials. and Insurance. first, then look at specific models.
Key facts
- Credentials.
- Insurance.
- Certification.
FAQ
What is a Contractor checklist?
For Contractor, follow a checklist: backup, format, size/quality, output, spot-check. Credentials/insurance/certification/portfolio/quotes.
How long does it take?
Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.
Is data uploaded?
Runs locally and does not upload video/audio; extensions may still read the page.
Source: IICRC