Basic Rebuild handling is usually free; a local browser tool can convert/compress/check it. Rebuild depends on materials/area/permits/timeline; insurance may separate.
Why it matters
Rule out free options before paying for software or a service.
Materials.
Step by step
- Stop water/power/photograph/contact insurance.
- Separate drying/demolition/mold/rebuild/contents.
- Get 2-3 quotes; confirm scope/equipment/timing.
- Claim states deductible/exclusions/depreciation.
Common mistakes
- No photos/claim.
- Comparing totals without scope/equipment.
- Ignoring mold/hidden moisture.
- Not checking deductible/depreciation/exclusions.
Checklist
- Stop water/power/photos/insurance.
- Drying/demolition/mold/rebuild/contents.
- Scope/equipment/timing/quotes.
- Deductible/depreciation/exclusions/claim.
- Contract/payment/warranty.
Who it is for
If you are calculating total cost, include Materials., Area. and upkeep, not just the purchase price.
Key facts
- Materials.
- Area.
- Permits.
FAQ
Do I need to pay to handle Rebuild?
Basic Rebuild handling is usually free; a local browser tool can convert/compress/check it. Rebuild depends on materials/area/permits/timeline; insurance may separate.
How long does it take?
Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.
Is data uploaded?
Runs locally and does not upload video/audio; extensions may still read the page.
Source: IICRC