Permits is the core object here; understand the problem it solves before choosing a tool or workflow. Rebuild/structure/electrical may need permits/inspection.
Why it matters
Without the concept, format, permission or compatibility issues are easily misread as tool failures.
Rebuild.
Step by step
- Stop water/power/photograph/contact insurance.
- Separate drying/demolition/mold/rebuild/contents.
- Get 2-3 quotes; confirm scope/equipment/timing.
- Claim states deductible/exclusions/depreciation.
Common mistakes
- No photos/claim.
- Comparing totals without scope/equipment.
- Ignoring mold/hidden moisture.
- Not checking deductible/depreciation/exclusions.
Checklist
- Stop water/power/photos/insurance.
- Drying/demolition/mold/rebuild/contents.
- Scope/equipment/timing/quotes.
- Deductible/depreciation/exclusions/claim.
- Contract/payment/warranty.
Who it is for
If this is your first Permits, narrow by Rebuild. and Structure. first, then look at specific models.
Key facts
- Rebuild.
- Structure.
- Electrical.
FAQ
What is Permits?
Permits is the core object here; understand the problem it solves before choosing a tool or workflow. Rebuild/structure/electrical may need permits/inspection.
How long does it take?
Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.
Is data uploaded?
Runs locally and does not upload video/audio; extensions may still read the page.
Source: IICRC