Handling Estimate is usually about compatibility, sharing, archiving or saving space; define the goal before choosing an approach. Estimates should separate drying/demolition/mold/rebuild/contents.
Why it matters
Different goals imply different formats, tools and quality settings.
Drying.
Step by step
- Stop water/power/photograph/contact insurance.
- Separate drying/demolition/mold/rebuild/contents.
- Get 2-3 quotes; confirm scope/equipment/timing.
- Claim states deductible/exclusions/depreciation.
Common mistakes
- No photos/claim.
- Comparing totals without scope/equipment.
- Ignoring mold/hidden moisture.
- Not checking deductible/depreciation/exclusions.
Checklist
- Stop water/power/photos/insurance.
- Drying/demolition/mold/rebuild/contents.
- Scope/equipment/timing/quotes.
- Deductible/depreciation/exclusions/claim.
- Contract/payment/warranty.
Who it is for
If this is your first Estimate, narrow by Drying. and Demolition. first, then look at specific models.
Key facts
- Drying.
- Demolition.
- Rebuild.
FAQ
Why should I handle Estimate?
Handling Estimate is usually about compatibility, sharing, archiving or saving space; define the goal before choosing an approach. Estimates should separate drying/demolition/mold/rebuild/contents.
How long does it take?
Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.
Is data uploaded?
Runs locally and does not upload video/audio; extensions may still read the page.
Source: IICRC